Information
Level 4 Data summaries and links to related documents and reports
Key findings
- Small amounts of rain at 10 mm hr-1 or greater are required for ponding and the initiation of overland flow.
- 2 per cent of total rain is transferred out of the 100 m transect
- The remainder contributes to soil water store and deep drainage
Key table and figures extracted from data, literature and miscellaneous publications